The pumping and drainage systems at The hydropower plant Nam-theun 1 – Laos.
1. Location: Lao People's Democratic Republic
2. Investor: Phonensack Group (Thailand)
3. Scope of implementation:
Drainage phase of Foundation pit
Supply and installation of 06 pump units with:
Q = 600 - 400 m3 / h; Capacity: 55kW; H = 15 - 25m
4. Implementation time: 2016 - 2021


Construction phase of terraced water supply system
Supply and installation of 06 pump stations (PS):
PS1: Average floating on river: 02 groups of submersible pumps, Q = 330m3 / h, H = 70m, N = 75kW
PS2: 04 pump units: Q = 150m3 / h, H = 90m, N = 55kW
PS3: 02 pump units: Q = 330m3 / h, H = 70m, N = 75kW
PS4: 01 pump unit: Q = 100m3 / h, H = 120m, N = 55kW
PS5: 01 pump unit: Q = 100m3 / h, H = 120m, N = 55kW
PS6: 01 pump unit: Q = 100m3 / h, H = 120m, N = 55kW